How Long Does a Kitchen Renovation Take?

If you’re planning a kitchen renovation, one of the most important questions is: “How long does a kitchen renovation take?” The answer isn’t always straightforward because the kitchen renovation process involves multiple phases, each with its own timeline. Generally, a complete kitchen renovation takes between 4-12 weeks depending on scope, complexity, and unexpected challenges.

This guide breaks down the entire process — from initial planning to the final touches — to help you create a realistic kitchen remodel schedule for your home improvement project. We’ll also explore factors that can extend your renovation timeline and provide tips to keep your contractor schedule on track.

The kitchen is often considered the heart of the home, making kitchen renovations among the most impactful home improvement projects you can undertake. However, being without a functional kitchen creates significant daily disruptions, so understanding the typical time frame for a kitchen renovation is essential for proper planning and maintaining your sanity during the process.

Quick Answer: Kitchen Renovation Timeline Overview

Before diving into details, here’s a quick summary of how long does a kitchen renovation take:

  • Small kitchen renovation (cosmetic updates only): 1-2 weeks
  • Medium renovation (some structural changes): 3-6 weeks
  • Major kitchen remodel (complete gut renovation): 8-12+ weeks

For more information on planning your kitchen renovation, visit Cost of Kitchen Renovations in UK

Phase-by-Phase Kitchen Renovation Timeline

Understanding each phase of the renovation process helps set realistic expectations and allows for proper planning. Let’s examine the typical timeline for each stage of a kitchen renovation.

Kitchen Renovation Timeline

Phase 1: Design and Planning Phase (2-6 weeks)

The planning stage is crucial for a smooth renovation and often takes longer than homeowners expect. This initial phase of the kitchen renovation process includes:

  • Initial concept development: 1-2 weeks
    • Meeting with designers or contractors
    • Discussing goals and budget
    • Reviewing inspiration images
    • Preliminary layout discussions
  • Detailed design planning: 1-2 weeks
    • Finalizing layout decisions
    • Creating detailed drawings
    • Specifying cabinet configurations
    • Planning lighting and electrical locations
  • Material selection: 1-2 weeks
    • Choosing cabinet styles and finishes
    • Selecting countertop materials
    • Deciding on flooring options
    • Picking backsplash materials
    • Choosing appliances, fixtures, and hardware
  • Obtaining permits (if required): 2-4 weeks (can run concurrently with other planning tasks)
    • Submitting plans to local building department
    • Addressing any required revisions
    • Receiving approved permits

Why this phase is important: Taking time during planning prevents costly mid-project changes and ensures all materials are ordered before demolition and installation begins. Many renovation delays occur because decisions weren’t finalized before construction started.

Planning tip: Create a detailed document with all specifications, model numbers, and finish selections to share with your contractor. This prevents miscommunication and ensures everyone has the same vision for the final result.

Phase 2: Demolition (1-3 days)

Once planning is complete and materials are ordered, demolition begins:

kitchen Demolition

  • How long does a small kitchen renovation take for demolition: 1 day
  • Medium to large kitchen: 2-3 days

Demolition involves removing:

  • Existing cabinets
  • Countertops
  • Flooring
  • Appliances
  • Some wall sections (if layout is changing)
  • Old lighting fixtures
  • Backsplash
  • Sometimes underlying subfloor or drywall

Health and safety note: Older homes may contain hazardous materials like asbestos or lead paint. If your home was built before 1980, consider professional testing before demolition begins. Proper removal of these materials adds time to your renovation but protects your family’s health.

Pro tip: Arrange for a dumpster delivery before demolition begins, and consider temporary kitchen arrangements as you’ll be without a functional kitchen from this point forward in your renovation process.

Phase 3: Structural Changes and Rough-Ins (1-2 weeks)

Structural Changes and Rough

With the old kitchen removed, your contractor will:

  • Make structural changes (removing walls, adding support beams): 2-5 days
    • Opening up walls to create open-concept layouts
    • Installing support beams where load-bearing walls are removed
    • Framing for islands or peninsulas
  • Complete rough electrical work: 1-3 days
    • Installing new circuits for appliances
    • Running wiring for lighting
    • Adding outlets to meet current code requirements
    • Installing junction boxes for fixtures
  • Update plumbing: 1-3 days
    • Relocating water lines for sinks or refrigerators
    • Updating drain lines
    • Installing shut-off valves
    • Preparing for dishwasher connections
  • Install new windows or doors (if applicable): 1-2 days per opening
    • Removing old windows/doors
    • Preparing rough openings
    • Installing new units
    • Weather sealing and insulating

Inspection note: Most localities require inspections after rough-in work is completed. Allow 1-3 days for scheduling and completing inspections during your construction timeline. Failed inspections can add significant time to your renovation schedule.

Hidden problems: This phase often reveals unexpected issues like water damage, outdated wiring, or non-code-compliant plumbing that must be addressed before proceeding. Budget extra time and money for these potential discoveries.

Phase 4: Drywall, Painting and Flooring (1-2 weeks)

Once rough-ins are complete and inspections passed:

Kitchen Flooring

  • Drywall installation or repairs: 1-4 days
    • Hanging new drywall where walls were opened
    • Patching existing drywall where needed
    • Taping and mudding seams
    • Sanding for smooth finish
  • Primer and paint: 2-3 days
    • Priming all surfaces
    • Painting ceiling
    • Painting walls
    • Allowing proper drying time between coats
  • Flooring installation: 1-4 days (depending on material)
    • Preparing subfloor
    • Installing underlayment if required
    • Installing new flooring material
    • Trim and transition pieces

Material considerations: Different flooring types have varying installation and curing times:

  • Hardwood: May need 3-7 days to acclimate before installation, plus 24 hours of curing time after finishing
  • Tile: Requires additional time for mortar to set (24 hours) and grout to cure (72 hours before heavy use)
  • Vinyl or laminate: Generally quicker to install with minimal curing time
  • Natural stone: Often requires sealing after installation with 24-48 hour cure time

Sequencing tip: While paint and flooring could be done in either order, many professionals prefer to paint first and then install flooring to prevent paint splatter on new floors. However, if your renovation includes refinishing existing hardwood floors, the sanding process creates significant dust that could affect fresh paint, so flooring would come first in that scenario.

Phase 5: Cabinet and Countertop Installation (1-3 weeks)

This phase often takes the longest in the kitchen renovation steps and includes:

Cabinet and Countertop Installation

  • Cabinet installation: 2-5 days
    • Installing base cabinets
    • Leveling and securing cabinets to walls
    • Installing upper cabinets
    • Adding filler pieces and trim
    • Installing cabinet hardware
  • Countertop template creation: 1 day
    • Precise measurements taken after cabinets are installed
    • Template creation for custom countertops
  • Countertop fabrication: 7-14 days (for stone countertops)
    • Cutting stone to template specifications
    • Finishing edges
    • Creating cutouts for sink and faucet
    • Polishing and sealing (for natural stone)
  • Countertop installation: 1 day
    • Delivering countertop sections
    • Installing and securing to cabinets
    • Seaming sections together (if necessary)
    • Final adjustments and caulking
  • Backsplash installation: 1-3 days (including time for grout to cure)
    • Preparing wall surface
    • Installing tile or backsplash material
    • Grouting (if tile)
    • Sealing grout lines

Important timeline note: There’s typically a wait period between cabinet installation and countertop installation. Custom kitchen build elements can’t be fabricated until cabinets are installed and measurements are verified. This waiting period is often when homeowners experience the most frustration with kitchen renovation timelines.

Material delays: Stock cabinets may be available within 2-3 weeks, but semi-custom options typically take 4-8 weeks, and fully custom cabinetry can take 8-12+ weeks to fabricate. Plan your kitchen remodel schedule accordingly by ordering these long-lead items as early as possible.

Phase 6: Fixture, Appliance Installation and Finishing Touches (3-7 days)

New kitchen under construction in residential house

The final phase includes:

  • Sink and faucet installation: 1 day
    • Installing undermount, farmhouse, or drop-in sink
    • Connecting faucet
    • Testing for leaks
    • Installing garbage disposal if included
  • Light fixture installation: 1-2 days
    • Installing pendant lights
    • Recessed lighting
    • Under-cabinet lighting
    • Connecting switches and dimmers
  • Appliance installation: 1-2 days
    • Delivering appliances
    • Installing dishwasher
    • Connecting refrigerator water line
    • Installing range/cooktop and oven
    • Installing range hood and venting
    • Installing microwave
  • Hardware installation (cabinet pulls, knobs): 1 day
    • Measuring and marking placement
    • Installing pulls and knobs
    • Making adjustments for alignment
  • Final trim work and touch-ups: 1-2 days
    • Installing crown molding
    • Adding toe kicks
    • Caulking gaps
    • Touch-up painting
    • Final adjustments to cabinet doors and drawers

Appliance considerations: If you’re purchasing new appliances, order them at least 4-8 weeks before you expect to need them. Supply chain issues can significantly impact delivery times, especially for high-end or special order appliances.

Pro tip: Have your contractor verify all necessary electrical and plumbing connections are compatible with your selected appliances before installation day to avoid last-minute surprises.

Phase 7: Final Inspections and Clean-up (1-2 days)

Kitchen Renovation uk

  • Final inspections (if required): Schedule at least 1 week in advance
    • Electrical final inspection
    • Plumbing final inspection
    • Building final inspection
  • Thorough cleaning: 1 day
    • Removing construction dust
    • Cleaning inside cabinets
    • Washing windows
    • Cleaning appliances
    • Polishing fixtures
  • Final walkthrough with contractor: 1 day
    • Creating punch list of remaining items
    • Reviewing warranty information
    • Final payment

Inspection scheduling: Final inspections can cause unexpected delays if the inspector finds issues that need correction. Always include buffer time in your kitchen remodel schedule for potential inspection failures and corrections.

Factors That Can Extend Your Kitchen Renovation Timeline

Even with careful planning, several factors can cause renovation delays:

1. Material Availability and Delivery Times

Common lead times to consider:

  • Stock cabinets: 2-3 weeks
  • Semi-custom cabinets: 4-8 weeks
  • Custom cabinets: 8-12+ weeks
  • Natural stone countertops: 1-3 weeks after template
  • Special order appliances: 2-12 weeks
  • Custom doors or windows: 6-12 weeks
  • Imported tiles or materials: 6-10 weeks

Planning tip: Order materials as early as possible, especially long-lead items like cabinets and custom elements to maintain your kitchen remodel schedule. Current supply chain challenges have made delivery timelines less predictable than in previous years.

Material substitutions: Be prepared with backup selections for key materials in case your first choice becomes unavailable or significantly delayed. Having these contingency plans prevents your entire renovation from stalling.

2. Scope Changes and Design Modifications

Making changes after construction begins almost always extends the average time for kitchen renovation. Common mid-project changes include:

  • Modifying cabinet layouts
  • Changing countertop materials
  • Adding features not in original plans
  • Relocating plumbing or electrical
  • Upgrading appliances
  • Adding custom storage solutions
  • Expanding the project scope to adjacent areas

Impact on timeline: Minor changes can add days; major changes can add weeks to how long it takes to renovate a kitchen from start to finish.

Change order process: Most contractors require signed change orders detailing cost and timeline impacts before implementing changes. This documentation process itself can add time to your renovation.

3. Unexpected Issues During Demolition

Once walls and floors are opened up, contractors sometimes discover:

  • Water damage or mold
  • Outdated or unsafe electrical wiring
  • Plumbing issues that don’t meet code
  • Structural problems requiring additional support
  • Pest damage
  • Asbestos or lead paint
  • Uneven subfloors
  • Previous renovations not done to code

Timeline impact: Addressing these issues can add 1-3 weeks to your kitchen renovation duration depending on severity.

Contingency planning: Most contractors recommend setting aside 10-20% of your renovation budget for unexpected issues. This financial buffer helps address problems quickly without causing payment delays that could further extend your timeline.

4. Permit Delays and Inspection Scheduling

  • Initial permit approval: 1-6 weeks (varies greatly by location)
  • Inspection scheduling: 1-7 days
  • Failed inspections requiring corrections: 1-2 weeks
  • Special approvals (historic districts, HOAs, etc.): 2-8 weeks

Regional variation note: Permitting and inspection timelines vary significantly between municipalities. Urban areas often take longer than rural locations. Some cities have severe backlogs that can delay permit approvals by months.

Permit preparation: Working with design professionals who understand local code requirements can streamline the permit process. Well-prepared submissions with complete documentation encounter fewer delays.

5. Contractor Schedule and Crew Availability

Renovations involve multiple specialized trades working in sequence:

  • Demolition crew
  • Carpenters
  • Electricians
  • Plumbers
  • Drywall installers
  • Flooring specialists
  • Painters
  • Countertop fabricators
  • Tile installers
  • Finish carpenters

Scheduling challenges: When one trade falls behind, it creates a domino effect delaying subsequent work, affecting how long a kitchen renovation takes with contractors. Labor shortages in the construction industry have made scheduling even more challenging.

Communication tip: Request weekly schedule updates from your contractor, including which trades will be working when. This transparency helps you track progress and identify potential delays early.

Kitchen Renovation Timeline by Scope

Kitchen Renovation Timeline

Cosmetic Kitchen Makeover (1-2 weeks)

A kitchen makeover might include:

  • Painting cabinets
  • Replacing hardware
  • Installing new countertops with existing cabinet layout
  • Updating backsplash
  • Replacing light fixtures
  • Painting walls
  • Installing new faucet

This approach minimizes demolition and structural work, significantly shortening how long it takes to redo kitchen cabinets and countertops.

Cost-effective update: A cosmetic kitchen makeover provides significant visual impact at a fraction of the cost and time commitment of a full renovation. For homeowners with limited budgets or those planning to sell soon, this approach offers excellent return on investment.

Standard Kitchen Remodel (4-8 weeks)

A standard remodel typically includes:

  • New cabinets in roughly the same layout
  • New countertops
  • New appliances
  • Updated flooring
  • New lighting
  • Fresh paint
  • Minor plumbing relocations
  • New backsplash
  • New sink and faucet

This approach keeps the basic footprint but updates most visible elements, representing the average time for kitchen renovation.

Value-added improvements: Consider incorporating popular features that improve functionality, such as soft-close drawers, pull-out trash bins, deeper drawers for pots and pans, and under-cabinet lighting. These details enhance daily usability without significantly extending the timeline.

Major Kitchen Renovation (8-12+ weeks)

A major renovation involves:

  • Complete demolition to studs
  • Reconfigured layout
  • Wall removal or structural changes
  • All new cabinets, countertops, and appliances
  • New flooring
  • Updated electrical throughout
  • Plumbing relocations
  • New windows or doors
  • Custom features or built-ins
  • Upgraded ventilation
  • Smart home technology integration
  • Custom lighting plan

This comprehensive approach requires the longest timeline but offers the most dramatic transformation. This is what determines how long should a full kitchen remodel take.

Long-term investment: Major renovations are best for homeowners planning to remain in their homes for 5+ years, allowing them to enjoy the benefits of their investment and recoup costs when eventually selling.

DIY vs. Professional: How Long Does a Kitchen Renovation Take?

How Long Does a DIY Kitchen Renovation Take?

If you’re wondering how long does a DIY kitchen renovation take, be prepared for a longer timeline:

  • Small DIY kitchen update: 2-4 weeks (working weekends)
  • Medium DIY renovation: 6-12 weeks (working part-time)
  • Major DIY renovation: 4-8 months (working part-time)

DIY renovations typically take 1.5-3 times longer than professional work due to:

  • Learning curve for specialized skills
  • Limited tools and equipment
  • Working part-time rather than full-time
  • Potential mistakes requiring correction
  • Lack of trade relationships for scheduling subcontractors
  • Less experience managing project flow and sequencing

DIY success tips: Focus on tasks within your skill level and hire professionals for electrical, plumbing, and structural work. This hybrid approach often provides the best balance of cost savings and quality results.

How Long Does a Kitchen Renovation Take With Contractors?

Professional contractors can complete renovations more efficiently:

  • Small professional renovation: 1-3 weeks
  • Medium professional renovation: 3-6 weeks
  • Major professional renovation: 6-12 weeks

The efficiency comes from:

  • Specialized knowledge and experience
  • Proper tools and equipment
  • Full-time work schedule
  • Established relationships with suppliers and subcontractors
  • Familiarity with building codes and permit processes
  • Ability to anticipate and quickly address challenges

Contractor selection tip: When interviewing potential contractors, ask specifically about their approach to scheduling and timeline management. Contractors who can provide detailed timelines with specific milestones demonstrate better project management skills.

Seasonal Considerations for Kitchen Renovations

The time of year can impact your renovation timeline:

Summer (Peak Season)

  • Pros: Weather conditions favorable for construction
  • Cons: Contractors often booked months in advance; permits may take longer due to high volume; potential vacation conflicts with crew availability

Fall

  • Pros: Contractors becoming less busy; moderate weather conditions; potential for completion before holiday season
  • Cons: Material delivery times may be affected by holiday shipping volumes; some trades may have limited holiday availability

Winter

  • Pros: Often easier to schedule contractors; potential off-season discounts; faster permit processing in many areas
  • Cons: Weather may delay material deliveries; holiday schedules can interrupt work flow; heating considerations during construction

Spring

  • Pros: Good weather conditions returning; before peak summer demand; increased daylight hours for work
  • Cons: Contractor schedules filling up; spring rains can cause delays; potential material price increases

Regional considerations: These seasonal factors vary by climate region. In southern states, summer heat may actually slow construction, while winter provides ideal working conditions. In northern regions, exterior modifications (like window replacements) may be challenging during winter months.

Tips to Keep Your Kitchen Renovation Process on Schedule

1. Complete All Design Decisions Before Construction

Finalize these elements before demolition begins:

  • Cabinet style, dimensions, and layout
  • Countertop material and edge profile
  • Appliance selections and specifications
  • Flooring material
  • Backsplash design
  • Light fixture selections
  • Paint colors
  • Hardware choices
  • Sink and faucet style
  • Ventilation requirements

Time-saving tip: Create a detailed spreadsheet with all finish selections, model numbers, and order status to help manage your renovation budget and timeline. Share this document with your contractor and update it as orders are placed and materials arrive.

2. Order Materials Early and Confirm Delivery Dates

  • Order cabinets 6-12 weeks before needed
  • Purchase appliances 4-8 weeks in advance
  • Order countertop materials before cabinet installation
  • Have all fixtures on-site before plumbers arrive
  • Confirm delivery dates for all materials regularly
  • Arrange proper storage for materials that arrive early

Tracking system: Create a dedicated email folder for order confirmations and shipping notifications. Set calendar reminders to follow up on orders if you haven’t received shipping information by expected dates.

3. Build Buffer Time Into Your Schedule

Always add a 10-20% time buffer to accommodate unexpected issues in your construction timeline:

  • For a 6-week renovation, plan for 7-8 weeks
  • For major projects, add 2-3 weeks to estimated timeline
  • Don’t schedule critical events (like hosting holidays) immediately after expected completion
  • Consider how rental costs or temporary housing might extend if needed

Realistic expectations: Understanding that delays are common helps manage stress during the renovation process. The most successful renovations prioritize quality results over rigid timelines.

4. Create a Temporary Kitchen Setup

Reduce stress during your home improvement project by creating a functional temporary kitchen:

  • Microwave
  • Electric hot plate
  • Toaster oven
  • Small refrigerator
  • Electric kettle
  • Coffee maker
  • Paper plates and disposable utensils
  • Water source
  • Designated dining area
  • Storage bins for essential cooking tools and pantry items

Location ideas: Basements, dining rooms, or laundry rooms often make good temporary kitchen locations. If weather permits, outdoor grilling can supplement cooking options.

5. Maintain Regular Communication With Your Contractor

  • Schedule weekly progress meetings
  • Establish preferred communication methods
  • Address concerns immediately rather than letting them accumulate
  • Request updated timelines if delays occur
  • Be available to make quick decisions when unexpected issues arise
  • Document conversations about timeline changes or project modifications

Decision authority: Designate one person as the primary decision-maker to avoid contradictory instructions that can cause confusion and delays.

FAQs About Kitchen Renovation Timelines

Q: What’s the fastest a complete kitchen renovation can take?

With exceptional planning, pre-ordered materials, and an experienced team working full-time, a basic kitchen renovation might be completed in 3-4 weeks. However, rushing often leads to mistakes and quality issues.

Q: Should I move out during a kitchen renovation?

For renovations lasting more than 2-3 weeks, consider temporary accommodations if your budget allows. Living without a kitchen creates significant daily challenges, particularly for families with young children.

Q: What is the typical time frame for a kitchen renovation?

The typical time frame for a kitchen renovation is 4-8 weeks for a standard remodel. Small updates might take only 1-2 weeks, while major renovations can extend to 12+ weeks.

Q: Which part of a kitchen renovation typically causes the most delays?

Cabinet delivery and installation often cause the most significant delays. Custom cabinetry can take 8-12 weeks to manufacture, and any measurement errors can add weeks to the timeline.

Q: How far in advance should I book a contractor for my kitchen renovation?

For quality contractors, plan to book 2-6 months in advance, especially during peak seasons (spring and summer). The best contractors often have waiting lists of several months.

Q: How long does it take to redo kitchen cabinets and countertops?

If you’re only replacing cabinets and countertops without changing the layout, expect about 2-4 weeks: 1-2 days for demolition, 1-3 days for cabinet installation, 1-2 weeks for countertop fabrication after measurement, and 1 day for countertop installation.

Q: How can I speed up my kitchen renovation?

To accelerate your renovation, have all materials on-site before demolition begins, be available daily to make quick decisions, hire a contractor with a dedicated crew rather than one juggling multiple projects, and consider pre-fabricated or stock options instead of custom elements.

Q: What’s the difference in timeline between stock and custom cabinets?

Stock cabinets can often be delivered in 1-3 weeks, while custom cabinets typically take 8-12 weeks to manufacture. Semi-custom options offer a middle ground at about 4-8 weeks.

Conclusion: Creating a Realistic Kitchen Renovation Timeline

A successful kitchen renovation balances efficiency with quality workmanship. While it’s natural to want your new kitchen as quickly as possible, rushing the process often leads to mistakes, rework, and disappointment with the final results.

By understanding how long it takes to renovate a kitchen from start to finish and building in buffer time for unexpected challenges, you’ll set realistic expectations for your project. Remember that a well-executed kitchen renovation adds significant value to your home and quality of life for years to come—making the temporary inconvenience worthwhile.

Whether you’re planning a quick kitchen makeover or a complete custom kitchen build, proper planning and patience are your best tools for renovation success. The detailed timeline in this guide provides a framework, but always work closely with your chosen professionals to create a schedule tailored to your specific project.

Author

  • dog lovers den logo

    Emma Collins is a digital marketing strategist specializing in SEO and online growth for home service businesses. With over eight years of experience, she has helped plumbing, HVAC, and home improvement companies boost their online presence through search engine optimization, content marketing, and Google My Business optimization. Emma is passionate about creating strategies that drive real results, helping local businesses attract more customers and grow sustainably